Alex Tavor
I build the tools other devs build with
Fifteen years of authoring systems, visual editors, and the compilers and toolchains underneath them. Lately: what it takes to trust code an agent wrote, which comes down to whether the tests would catch a bug. I write up what I build, including the parts that did not work.
Writing
- The cheap gate did all the work I ran a controlled experiment against my own methodology and stopped it. What survived was the cheapest part.
- It worked, so I shut it down Building an agentic coding orchestrator, and what working proved.
Proof-Driven Development
Concluded in July 2026. The post-mortem says why, and the experiment is the evidence. These are what it was.
-
Explorer
An interactive map of the method: every rule, how they reinforce each other, and where each gate fires.
-
Discipline
The portable core as a reference: stack-independent engineering rules in full, grouped by theme, each citing the commits it was recovered from. Still maintained, as a plugin.
Code
Engines, authoring tools and local tooling are on GitHub.